image 1 image 2 image 3 image 4 image 5 image 6 image 7 image 8 image 9 image 10 image 11

The long awaited work to improve the drainage in the Playing Field off Sedgemoor Way is scheduled to start in early June. It will be paid for by way of a generous grant from Villages Together.

It will be necessary to close the field and play area to the public for the duration of the work which could be 2 to 3 weeks. This is in the interest of health and safety as large machinery will be used. The various kissing gates will be locked.

The work will enable the field to be used throughout the year for sport and recreation.